Description
Equipment Technical Parameters
• Automation rate: 95%
• Availability: 90%
• Cycle time: 90 seconds/piece
• Changeover time: 30 minutes/cycle
• Process: Loading — Assembly — Marking — Pressure testing — Offline
Technical Performance and Features
• dianFully automated testing process (no manual intervention required)
• Automated assembly process, reducing manual handling and transportation
• Intelligent result judgment
• HPI data acquisition system (deeply interactive with factory MES)
• Dual video camera system, real-time recording of the entire production process
• Detection of product furnace number, visual positioning to prevent errors
• Quick tooling changeover, meeting the needs of rapid product changeover.









